Material Uncoiler
Handles steel coil at the line entry. Discuss coil weight, strip width and the loading arrangement for your plant.
Review: coil and handling requirements.
Explore Material UncoilerEQUIPMENT AROUND THE ERW LINE
A tube mill project involves more than the forming mill. Coil entry, strip preparation, welding, cutting, tooling and finished-tube handling should be reviewed against your production plan.
Equipment shown here is a guide for discussion. The included, optional and excluded scope is confirmed in your project proposal.

01 / PLANNING THE LINE
The equipment you need depends on the tubes, material, coil handling, output target, cutting requirement and factory layout. Use the groups below to explore XFX's existing equipment pages, then confirm the actual arrangement in a project proposal.
These groups help buyers navigate the process; they are not a fixed engineering bill of materials or a promise that every item is included.
02 / EXPLORE XFX EQUIPMENT
Each link opens an existing XFX English equipment category. Share your actual requirements before deciding the configuration.
Discuss how steel strip enters the line and how supply is managed through coil changes.
Handles steel coil at the line entry. Discuss coil weight, strip width and the loading arrangement for your plant.
Review: coil and handling requirements.
Explore Material UncoilerCuts and joins strip ends around a coil change. Discuss how strip preparation and joining should fit your line arrangement.
Review: strip-joining method and coil-change needs.
Explore Shearing and Welding MachineStores strip for continued feed while coils are changed or joined. Discuss the line speed target and available layout space.
Review: strip continuity and line arrangement.
Explore Material AccumulatorReview the seam-welding equipment against the tube schedule and material.
Provides high-frequency welding for the longitudinal seam. Discuss tube size, wall thickness, material and line-speed requirements.
Review: welding configuration for the project.
Explore High-Frequency WelderDiscuss finished length, end quality and how tubes leave the line.
Cuts finished tubes to length. XFX's existing category covers hot friction saw and cold saw choices; the cutting method is a project decision.
Review: sizes, wall thicknesses, finished length and cut-end needs.
Explore Pipe Cutting SawReceives finished tubes after cutting. Discuss the discharge and handling arrangement required at the end of your line.
Review: tube handling and plant layout.
Explore Pipe Run-Out TableMatch tooling to the actual tube schedule and review any treatment needed for the product.
Rolls are planned around tube shape, each exact size and its matching wall thickness. Discuss which sizes you will run and your size-change plan.
Review: tooling scope for every planned size.
Explore Roll ToolingRelates to weld-seam zinc treatment for relevant galvanized-tube projects. Discuss whether seam protection is needed for your product and process.
Review: material and weld-seam treatment needs.
Explore Zinc Spraying Machine03 / YOUR PRODUCTION PLAN
Start with the tube list and the way you intend to operate the line. XFX can review which equipment and tooling should be discussed for your project; this page does not select a package automatically.
You can begin with partial information. We can identify what else is needed before a final configuration is proposed.
Explore complete ERW tube mill linesA first inquiry can be sent before this list is complete.
04 / COMPARE THE SCOPE
When comparing proposals, check the equipment scope as well as the total price. The final included, excluded and optional items should be stated for your project.
No listed auxiliary item is assumed to be standard, free or suitable for every ERW project.
05 / FACTORY & SUPPORT
XFX has its own factory in China. We can provide on-site installation and commissioning, operator training, remote technical support, operation and maintenance documents, and spare-parts support.
The service arrangement is confirmed in the project proposal. For overseas installation, the customer is responsible for the installation personnel's visas, international travel, accommodation, meals and wages during the installation period.
Contact XFX about your project

06 / BUYER QUESTIONS
No fixed package is assumed here. Equipment included, excluded or offered as an option is confirmed in the proposal for your tube schedule and production plan.
Send the tube sizes, matching wall thicknesses, material, finished length and cut-end requirement. XFX can discuss the cutting method for the project; this overview does not promise a universal choice.
List each tube shape and exact size with its matching wall thickness, plus your planned size changes. Tooling scope can then be discussed with the line configuration.
Yes. Send what you already know. We can identify the missing details needed for the project proposal.
07 / DISCUSS YOUR LINE
Tell us the shapes, exact sizes with matching wall thicknesses, material and any known coil, speed, cut-length or layout requirements. We can discuss the equipment scope with you.
View the Contact pageSEND AN INQUIRY
Start with what you know. Include each tube size and its matching wall thickness where available.